Black Carbon AI

Confidential — For Discussion Purposes Only

BLACK CARBONAI

A SPAC Offering to Power Africa's Energy and AI Future

USD 300 Million

Download Prospectus
Digital Africa

The Opportunity

Africa's USD 1 Trillion Digital Infrastructure Gap

0%

Growth in Africa's data center market by 2030

0%

Demand-supply gap in digital infrastructure

#1

Obstacle to AI deployment: lack of reliable power

Integrated Facility

The Solution

Owning the Entire Value Chain

Black Carbon AI solves Africa's power problem by building its own energy source directly at the fuel — the Okpara Mine in Enugu State, Nigeria. A fully vertically integrated system from mine to data center.

150 MW

Coal-Fired Power Plant

Turn-key power generation built directly at the mine mouth, eliminating fuel transport costs.

100 MW

Power to the Grid

Stable baseload electricity supplied to the local grid via long-term Power Purchase Agreements.

50 MW

Captive AI Power

Dedicated power for the co-located AI data center. Zero reliance on the national grid.

Premium Coal

The Asset

"The Rolls-Royce"

of African Coal

Calorific Value6,992 kcal/kg
Ash Content7.7%
Sulfur Content0.57%

No Washing Required

Investment-grade fuel, straight from the ground. Saves USD 50-100M in CAPEX.

Proven Longevity

50+ Years of Proven Reserves

The Okpara Mine sits within the broader Enugu coal basin, extensively surveyed by the Nigerian Ministry of Mines and independently tracked by the Global Energy Monitor.

0M

Metric Tonnes

Proven Reserves

Ministry of Mines, 2018

48-61 Years

at full 150 MW capacity

0M

Metric Tonnes

Estimated Reserves

Global Energy Monitor, 2017

200+ Years

multi-generational asset

0M+

Metric Tonnes

Broader Enugu Basin

Multiple geological surveys

500+ Years

with future expansion

The Raise

USD 300 Million

Fully funded from planning through commissioning. No additional capital required.

PhaseDescriptionBudget
Phase 1

Project Development & Planning

Months 1-12

$7.6M
Phase 2

Engineering, Procurement & Contracting

Months 6-18

$73.7M
Phase 3

Construction & Installation

Months 12-24

$119.4M
Phase 4

Testing, Commissioning & Training

Months 18-30

$53.7M
Other

Success Fees, Taxes & Facilitation

$45.6M
TotalEstimated Project Cost$300M

The Turn-Key 150 MW Coal-Fired Power Plant represents approximately USD 196 million (65%) of the total budget — the core of the investment.

AI Data Center

Revenue Model

Up to USD 600M Annual Revenue

Stream 1: Stability

100 MW

Power sales to the local grid via long-term Power Purchase Agreements. Africa's acute power deficit makes this a high-demand, low-risk revenue stream providing stable, predictable cash flow.

Stream 2: Growth

50 MW AI Data Center

The primary value driver. AI data centers generate USD 10-12 million in annual revenue per megawatt.

Potential Annual Revenue

$500-600M

Why Black Carbon AI

The Investment Case

01

De-Risked Asset

Known, surveyed reserves with 50+ years of proven supply at full capacity.

02

"Rolls-Royce" Coal

Africa's highest quality thermal coal. No washing, no beneficiation. Direct mine-to-market.

03

Captive Power Advantage

Self-sufficient energy eliminates Africa's biggest infrastructure risk. Zero grid reliance.

04

Explosive Market Growth

Africa's data center market growing 300%+ by 2030. A once-in-a-generation opportunity.

05

Fully Funded

USD 300M SPAC raise covers the entire project from planning through commissioning.