A SPAC Offering to Power Africa's Energy and AI Future
USD 300 Million
Download Prospectus
The Opportunity
0%
Growth in Africa's data center market by 2030
0%
Demand-supply gap in digital infrastructure
#1
Obstacle to AI deployment: lack of reliable power

The Solution
Black Carbon AI solves Africa's power problem by building its own energy source directly at the fuel — the Okpara Mine in Enugu State, Nigeria. A fully vertically integrated system from mine to data center.
150 MW
Coal-Fired Power Plant
Turn-key power generation built directly at the mine mouth, eliminating fuel transport costs.
100 MW
Power to the Grid
Stable baseload electricity supplied to the local grid via long-term Power Purchase Agreements.
50 MW
Captive AI Power
Dedicated power for the co-located AI data center. Zero reliance on the national grid.

The Asset
of African Coal
No Washing Required
Investment-grade fuel, straight from the ground. Saves USD 50-100M in CAPEX.
Proven Longevity
The Okpara Mine sits within the broader Enugu coal basin, extensively surveyed by the Nigerian Ministry of Mines and independently tracked by the Global Energy Monitor.
0M
Metric Tonnes
Proven Reserves
Ministry of Mines, 2018
48-61 Years
at full 150 MW capacity
0M
Metric Tonnes
Estimated Reserves
Global Energy Monitor, 2017
200+ Years
multi-generational asset
0M+
Metric Tonnes
Broader Enugu Basin
Multiple geological surveys
500+ Years
with future expansion
The Raise
Fully funded from planning through commissioning. No additional capital required.
| Phase | Description | Budget |
|---|---|---|
| Phase 1 | Project Development & Planning Months 1-12 | $7.6M |
| Phase 2 | Engineering, Procurement & Contracting Months 6-18 | $73.7M |
| Phase 3 | Construction & Installation Months 12-24 | $119.4M |
| Phase 4 | Testing, Commissioning & Training Months 18-30 | $53.7M |
| Other | Success Fees, Taxes & Facilitation | $45.6M |
| Total | Estimated Project Cost | $300M |
The Turn-Key 150 MW Coal-Fired Power Plant represents approximately USD 196 million (65%) of the total budget — the core of the investment.

Revenue Model
Stream 1: Stability
100 MW
Power sales to the local grid via long-term Power Purchase Agreements. Africa's acute power deficit makes this a high-demand, low-risk revenue stream providing stable, predictable cash flow.
Stream 2: Growth
50 MW AI Data Center
The primary value driver. AI data centers generate USD 10-12 million in annual revenue per megawatt.
Potential Annual Revenue
$500-600M
Why Black Carbon AI
Known, surveyed reserves with 50+ years of proven supply at full capacity.
Africa's highest quality thermal coal. No washing, no beneficiation. Direct mine-to-market.
Self-sufficient energy eliminates Africa's biggest infrastructure risk. Zero grid reliance.
Africa's data center market growing 300%+ by 2030. A once-in-a-generation opportunity.
USD 300M SPAC raise covers the entire project from planning through commissioning.

Powering Africa's AI Future from the Ground Up